SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.

   Gold/Mining/EnergyJBII - The Secret Catalyst Turns Plastics into Oil


Previous 10 Next 10 
To: the_worm06 who wrote (136)7/8/2011 8:58:59 PM
From: sickmoneky
4 Recommendations   of 704
 
I would say along with Billion dollar corporations you and stevef are way off base

Share RecommendKeepReplyMark as Last Read


From: Rawnoc7/11/2011 1:45:10 PM
2 Recommendations   of 704
 
Message 27484484

he's equating "tested" with stack test -- nothing says that it needs a formal stack test from CRA. In fact, the language he quotes suggest that it can be self tested "using EPA methods"

If they do 3 tests on 3 machines, that's fine. Who cares? It doesn't invalidate the stack tests because it doesn't say anything about a formal stack test. Looks more like a self-administered progress report which is normal and a far cry from "fines and shutdowns" as was orignally falsely insisted by SteveF.

Share RecommendKeepReplyMark as Last Read


From: Rawnoc7/11/2011 1:49:00 PM
2 Recommendations   of 704
 
Message 27484505

And managed to fool Islechem in the process?

Not even a remote chance. That theory is retarded.

The irony is you call him an IT guy -- but his educational backround is not in IT. And he's had outside engineers come in and help.

Share RecommendKeepReplyMark as Last Read


From: Rawnoc7/11/2011 1:52:32 PM
2 Recommendations   of 704
 
Message 27484514

Legal to ship. Not legal to operate. Had to be totally stripped and redesigned except for the drum. It had to conform to the SCALEABLE model from the coffee-maker sized model to the 1 ton sized model. They built the 1 ton unit by the way from SCRATCH.

Interesting that nobody has a conspiracy about where the 1 ton unit came from and why it scales from the unit they made from scratch to the 20 ton unit.

Share RecommendKeepReplyMark as Last Read


From: Rawnoc7/11/2011 3:20:01 PM
3 Recommendations   of 704
 
Message 27484736

Better question. If this laughable conspiracy theory even had an iota of truth to it, then how come John was able to build a 1 ton processor from scratch before he even got anything from China yet the process scales from the 1 ton he made to the 20 ton he supposedly bought from China?

Obviously he had to design the 20 ton in the same way he did the 1 ton.

Share RecommendKeepReplyMark as Last Read


From: Rawnoc7/11/2011 3:20:06 PM
3 Recommendations   of 704
 
Question -- how many of SteveF's hundreds of conspiracy theories haven't been destroyed and proven wrong? All of them?

Share RecommendKeepReplyMark as Last ReadRead Replies (1)


To: Rawnoc who wrote (144)7/11/2011 3:58:31 PM
From: jimmenknee
2 Recommendations   of 704
 
So you want the literal answer or do you want to re-interpret what you wrote to mean something other than what it actually says? ;)

Share RecommendKeepReplyMark as Last ReadRead Replies (1)


To: jimmenknee who wrote (145)7/11/2011 4:20:49 PM
From: Rawnoc
3 Recommendations   of 704
 
HA! Touche! Re-read it in your head with a sarcastic tone. ;)

That whole double negative thing is dangerous!

But not nearly as dangerous as some other things..... stay tuned. The shareholder base is moving forward.

Share RecommendKeepReplyMark as Last Read


To: 1Coffeehound who wrote (22)7/11/2011 4:26:42 PM
From: Rawnoc
3 Recommendations   of 704
 
Do you know what this sounds like after hearing it even the first time?

"Is June 15th the date when JB will have to give up the farce of production in New York state and move the farce of production elsewhere? In other words, is that the deadline for the successful submission of all the permit applications which, of course, will not happen?"
Message 27243429

3 processors:
"the New York Department of Environmental Conservation has received, on time, all submissions required under the Consent Order. These comprehensive submissions were constructed in line with the provisions set forth in the Consent Order. Submissions included a revised Air State Facility Permit for three processors, an Environmental Assessment, and Part 360 Solid Waste Permit binders."
plastic2oil.com

Share RecommendKeepReplyMark as Last ReadRead Replies (2)


To: Rawnoc who wrote (147)7/11/2011 5:31:50 PM
From: the_worm06
4 Recommendations   of 704
 
not really, please tell us what it sounds like.

thanks

the_worm06

Share RecommendKeepReplyMark as Last ReadRead Replies (1)
Previous 10 Next 10