SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: LoneClone who wrote (156904)7/22/2021 2:25:55 PM
From: LoneClone  Read Replies (1) of 161696
 
Marathon Gold Reports Latest Berry Drill Results and Provides Update on Exploration

Results include 5.59 g/t Au over 21m, 2.07 g/t Au over 37m, 1.58 g/t Au over 26m, 2.27 g/t Au over 13m, 2.08 g/t Au over 14m


ca.finance.yahoo.com

Marathon Gold Corporation
Thu., July 22, 2021, 4:30 a.m.

Figure 1



Location Map, Valentine Gold Project
Location Map, Valentine Gold ProjectFigure 2



Location of Berry Deposit Exploration Drill Hole Collars VL-21-1004 to VL-21-1023
Location of Berry Deposit Exploration Drill Hole Collars VL-21-1004 to VL-21-1023Figure 3



Long Section of the Berry Deposit on Northwesterly Azimuth, incorporating 60,317 meters of Drilling and Assays up to and Including VL-21-1023.

ORONTO, July 22, 2021 (GLOBE NEWSWIRE) -- Marathon Gold Corporation (“Marathon” or the “Company”; TSX: MOZ) is pleased to report the latest assay results from ongoing in-fill drilling at the 1.5 kilometre long Berry Deposit located at the Valentine Gold Project in central Newfoundland (the ‘Project”; Figure 1), and provide a general update on ongoing exploration activities.

The results released today represent fire assay data from the first twenty diamond drill holes completed at Berry upon the recommencement of drilling in May after the annual spring break. The Company recently released the first mineral resource estimate for Berry (see Marathon news release dated April 21, 2021). These latest holes represent in-fill drilling within less delineated hanging-wall portions of the deposit, and in the connecting area between the northeastern and southwestern resource pit shells (Figure 2). Highlights include:

  • VL-21-1010 intersected 5.59 g/t Au over 21 metres including 41.43 g/t Au over 2 metres, and 1.58 g/t Au over 26 metres including 10.22 g/t Au over 1 metre;

  • VL-21-1015 intersected 2.07 g/t Au over 37 metres including 11.78 g/t Au over 1 metre;

  • VL-21-1023 intersected 2.08 g/t Au over 14 metres, and 2.32 g/t Au over 10 metres;

  • VL-21-1020 intersected 0.86 g/t Au over 32 metres, and 0.74 g/t Au over 12 metres, and 1.41 g/t Au over 12 metres;

  • VL-21-1007 intersected 4.16 g/t Au over 5 metres including 12.19 g/t Au over 1 metre, and 1.34 g/t Au over 10 metres, and;

  • VL-21-1021 intersected 2.27 g/t Au over 13 metres.

  • All quoted intersections comprise uncut gold assays in core lengths. All significant assay intervals are reported in Table 1.

    Matt Manson, President and CEO, commented: “These latest drill results represent the progressive filling-out of our drill coverage at Berry over its full 1.5 kilometre extent, and at greater depths. We are seeing a distribution of mineralization very familiar to us from the nearby Leprechaun Deposit. This pattern is strong “Main Zone” type mineralization close to the Valentine Lake Shear Zone and generally more sporadic mineralization further out into the hanging-wall rocks. Hanging-wall mineralization can be locally very well developed, however, as demonstrated by drill hole VL-21-1010 in this recent batch, which returned multiple intercepts including 5.59 g/t Au over 21 metres starting at 28 metres down-hole. Overall, the deposit is developing consistent with our expectations. We currently have four diamond drill rigs operating at Valentine on our 2021 Exploration program, and an additional Reverse Circulation rig operating on our grade control and resource reconciliation program. We expect to be reporting results from these drill programs on a regular basis through to the end of the year.”

    A graphic accompanying this announcement is available at
    globenewswire.com

    The results released today are derived from seven drillholes located between sections 13488E and 13650E at the western end of the Berry Deposit, and thirteen drillholes located between sections and 14080E and 14590E, close to, or within, the connecting area between the two conceptual pit shells utilized in the April 2021 Berry Mineral Resource Estimate (Figures 2 and 3).

    Gold mineralization at the Valentine Gold Project is contained predominantly within shallowly southwest dipping, en-echelon stacked Quartz-Tourmaline-Pyrite-Gold (“QTP-Au”) veins. At the Leprechaun, Marathon and Berry Deposits, these QTP-Au veins form densely stacked and northwest plunging “Main Zone” envelopes within intrusive host rocks on the hanging wall (northwest) side of the Valentine Lake Shear Zone (“VLSZ”). The extent of mineralization appears related to the size and frequency of sheared mafic dykes which extend northeast-southwest within the hanging wall, parallel to the shear zone.

    Eleven of the twenty holes were oriented on a southeast azimuth towards the footwall contact with the VLSZ to test for mineralization at progressive distances into the Berry Deposit’s hanging-wall rocks (VL-21-1004, 1005, 1007, 1008, 1009, 1010, 1012, 1015, 1017, 1021, 1022). Nine of the twenty holes were oriented steeply down to the northwest testing for Main Zone type stacked QTP-Au mineralization, either close to the VLSZ (VL-21-1020, 1023) or within the hanging-wall (VL-21-006, 1011, 1013, 1014, 1016, 1018, 1019).

    Nineteen of the twenty drill holes returned “significant” drill intercepts of greater than 0.7 g/t Au (Table 1), and all twenty returned intercepts with gold grades above the 0.3 g/t Au cut-off used in the April 2021 Berry Mineral Resource Estimate.

    Graphics accompanying this announcement are available at
    globenewswire.com

    globenewswire.com

    Table 1: Significant Assay Intervals from Drill Hole Collars VL-21-1004 to VL-21-1023, Berry Deposit, Valentine Gold Project

    DDH

    Section

    Az

    Dip

    From

    To

    Core Length (m)

    True Thickness (m)

    Gold g/t

    Gold g/t (cut)

    VL-21-1004

    14440E

    165

    -70

    182

    186

    4

    3.40

    0.94






    230

    231

    1

    0.85

    0.80






    241

    242

    1

    0.85

    0.89


    VL-21-1005

    14080E

    165

    -60

    171

    172

    1

    0.80

    1.64






    190

    192

    2

    1.60

    6.21






    206

    207

    1

    0.80

    7.77






    263

    264

    1

    0.80

    1.97






    293

    295

    2

    1.60

    1.18


    VL-21-1006

    13540E

    343

    -70

    24

    26

    2

    1.70

    3.09






    42

    44

    2

    1.70

    0.75






    45

    47

    2

    1.70

    0.83






    70

    71

    1

    0.85

    0.87






    76

    80

    4

    3.40

    2.02






    95

    96

    1

    0.85

    0.92






    110

    111

    1

    0.85

    1.04






    125

    127

    2

    1.70

    0.77






    152

    153

    1

    0.85

    0.80


    VL-21-1007

    13540E

    163

    -69

    14

    19

    5

    4.25

    4.16


    including




    18

    19

    1

    0.85

    12.19






    92

    93

    1

    0.85

    1.22






    106

    116

    10

    8.50

    1.34






    157

    158

    1

    0.85

    0.78






    165

    167

    2

    1.70

    0.99






    197

    202

    5

    4.25

    0.97






    214

    215

    1

    0.85

    1.26






    225

    226

    1

    0.85

    1.44






    252

    253

    1

    0.85

    13.53






    257

    259

    2

    1.70

    1.71






    263

    264

    1

    0.85

    1.76


    VL-21-1008

    14500E

    164

    -65

    179

    183

    4

    3.40

    1.04






    199

    200

    1

    0.85

    2.20






    202

    203

    1

    0.85

    0.85


    VL-21-1009

    14080E

    162

    -70

    42

    45

    3

    2.55

    0.95






    52

    56

    4

    3.40

    1.40






    65

    66

    1

    0.85

    0.78






    77

    78

    1

    0.85

    1.12






    142

    143

    1

    0.85

    1.65






    160

    162

    2

    1.70

    3.14


    VL-21-1010

    13560E

    163

    -57

    28

    49

    21

    16.80

    5.59

    4.33

    Including




    40

    42

    2

    1.60

    41.43

    28.19





    79

    81

    2

    1.60

    3.57






    120

    121

    1

    0.80

    1.48






    153

    154

    1

    0.80

    0.89






    161

    187

    26

    20.80

    1.58


    Including




    178

    179

    1

    0.80

    10.22






    210

    211

    1

    0.80

    3.33


    VL-21-1011

    14088E

    343

    -78

    62

    64

    2

    1.80

    0.74






    75

    88

    13

    11.70

    0.78






    91

    92

    1

    0.90

    0.97






    107

    111

    4

    3.60

    1.54






    121

    128

    7

    6.30

    1.43






    161

    162

    1

    0.90

    2.47


    VL-21-1012

    14590E

    164

    -65

    15

    17

    2

    1.70

    1.34






    39

    52

    13

    11.05

    1.36






    82

    83

    1

    0.85

    1.49






    95

    100

    5

    4.25

    2.49






    113

    114

    1

    0.85

    14.37






    124

    125

    1

    0.85

    0.89


    VL-21-1014

    13488E

    343

    -75

    9

    10

    1

    0.90

    0.73






    12

    16

    4

    3.60

    0.78






    32

    33

    1

    0.90

    0.73






    38

    41

    3

    2.70

    0.92






    68

    69

    1

    0.90

    1.28


    VL-21-1015

    14200E

    163

    -70

    5

    6

    1

    0.85

    2.12






    57

    58

    1

    0.85

    0.76






    149

    154

    5

    4.25

    0.76






    177

    214

    37

    31.45

    2.07


    Including




    210

    211

    1

    0.85

    11.78






    234

    235

    1

    0.85

    0.94






    239

    240

    1

    0.85

    2.63


    VL-21-1016

    13590E

    342

    -64

    28

    29.94

    1.94

    1.65

    1.20






    31.82

    32.74

    0.92

    0.78

    3.54






    72

    73

    1

    0.85

    0.89






    78

    80

    2

    1.70

    0.97






    103

    104

    1

    0.85

    3.07






    110

    111

    1

    0.85

    1.51






    128

    131

    3

    2.55

    0.96


    VL-21-1017

    14310E

    165

    -64

    189

    190

    1

    0.85

    1.17






    193

    194

    1

    0.85

    2.37






    292

    294

    2

    1.70

    0.73






    311

    323

    12

    10.20

    0.81






    363

    365

    2

    1.70

    3.35


    VL-21-1018

    13630

    344

    -75

    30

    31

    1

    0.90

    2.64






    50

    53

    3

    2.70

    1.00






    55

    57

    2

    1.80

    1.58






    152

    153

    1

    0.90

    0.81






    181

    182

    1

    0.90

    0.74






    208

    209

    1

    0.90

    0.73






    232

    234

    2

    1.80

    1.38






    238

    239

    1

    0.90

    0.78


    VL-21-1019

    14140E

    344

    -75

    65

    69

    4

    3.60

    2.47






    73

    74

    1

    0.90

    0.72






    105

    106

    1

    0.90

    9.44


    VL-21-1020

    14160E

    343

    -73

    36

    37

    1

    0.85

    12.96






    56

    88

    32

    27.20

    0.86






    91

    92

    1

    0.85

    4.10






    97

    98

    1

    0.85

    1.47






    106

    107

    1

    0.85

    0.71






    129

    133

    4

    3.40

    1.64






    143

    155

    12

    10.20

    0.74






    179

    183

    4

    3.40

    0.90






    191

    195

    4

    3.40

    1.28






    205

    217

    12

    10.20

    1.41


    VL-21-1021

    13650E

    164

    -69

    161

    162

    1

    0.85

    2.06






    184

    197

    13

    11.05

    2.27


    VL-21-1022

    14220E

    164

    -65

    64

    65

    1

    0.85

    0.70






    233

    240

    7

    5.95

    0.92






    285

    287

    2

    1.70

    7.78






    319

    327

    8

    6.80

    0.72


    VL-21-1023

    14255E

    346

    -78

    70

    71

    1

    0.90

    0.81






    151

    152

    1

    0.90

    2.30






    189

    190

    1

    0.90

    7.15






    197

    198

    1

    0.90

    4.67






    205

    206

    1

    0.90

    1.12






    226

    227

    1

    0.90

    1.80






    235

    237

    2

    1.80

    3.40






    247

    257

    10

    9.00

    2.32






    275

    276

    1

    0.90

    4.24






    288

    302

    14

    12.60

    2.08




    Notes on the Calculation of Assay Intervals


  • “Significant” assay intervals are defined as 1m core length or more of mineralization with an average fire assay result of greater than 0.7 g/t Au, representing the bottom cut-off for high-grade mill feed in the Marathon April 2021 Feasibility Study mine plan. Assay intervals with an average fire assay result of between 0.3 g/t Au and 0.7 g/t Au are above the cut-off used in the April 2021 Mineral Resource Estimate for the Berry Deposit but are not considered “significant” for the purposes of this news release.

  • Cut gold grades are calculated at 30 g/t Au.

  • No significant assays were returned in drill hole VL-21-1013

  • Update on 2021 Exploration Program

    On February 2, 2021, the Company announced a 2021 Exploration Program focussed on growing the Project’s Mineral Resources. This program comprised a total of 52,000 metres of diamond drilling comprising up to 30,000 metres at the Berry Deposit, up to 8,000 metres at the Sprite and Victory Deposits, and up to 6,000 metres on grassroots initiatives. On May 6, 2021 the Company announced an expansion of the Berry drill program with an additional 50,000 metres of drilling to be completed prior to the summer of 2022, to bring the total inventory of drill data at Berry to approximately 120,000 metres.

    As of July 20, 2021, the Company had completed 119 drill holes at Berry in 2021, for a total of 31,691 metres, and released results for 71 holes representing 18,699 metres. Total drill metres completed at Berry to date stands at 73,309 metres. An additional 10 drill holes have also been completed for condemnation purposes in the area of the Marathon Waste Rock Facility, for a total of 1,538 metres. Four diamond drill rigs are currently operating at the Project. Drilling at the Berry Deposit is scheduled to continue steadily through to the end of November with up to three drill rigs. Drilling with the fourth rig has now commenced at the Victory Deposit, and is scheduled to commence at the Sprite Deposit in September.

    On May 6, 2021, the Company also announced a Reverse Circulation (“RC”) drill program of approximately 8,000 metres on the Leprechaun and Marathon Deposits, designed to test resource reconciliation and grade distribution within the first of the three planned mining pit phases at both ore bodies.

    This program comprises 6 x 12 metre drill spacings to a depth of up to 60 metres, designed to test broad-scale grade continuity. A tighter program of 6x6 metre drilling will test close grade continuity within the Marathon Deposit on the scale of the proposed 6x6x6 metre mining blocks.

    As of July 20, 2021, 51 RC holes had been completed at the Leprechaun Deposit, for 2,358 metres, and 127 holes had been completed at the Marathon Deposit for 5,292 metres. Drilling on this program is ongoing, and results from this program are expected to be available later this year.

    Qualified Person

    Disclosure of a scientific or technical nature in this news release was prepared under the supervision of Nicholas Capps, P.Geo. (NL), Manager of Exploration for Marathon Gold Corporation. Exploration data quality assurance and control for Marathon is under the supervision of Jessica Borysenko, P.Geo (NL), GIS Manager for Marathon Gold Corporation. Both Mr. Capps and Ms. Borysenko are qualified persons under National Instrument (“NI”) 43-101.

    Quality Assurance-Quality Control (“QA/QC”)

    QA/QC protocols followed at the Valentine Gold Project include the insertion of blanks and standards at regular intervals in each sample batch. Drill core is cut in half with one half retained at site, the other half tagged and sent to Eastern Analytical Limited in Springdale, NL. All reported core samples are analyzed for Au by fire assay (30g) with AA finish. All samples above 0.30 g/t Au in economically interesting intervals are further assayed using metallic screen to mitigate the presence of coarse gold. Significant mineralized intervals are reported in Table 1 as core lengths and estimated true thickness (70 - 95% of core length), and reported with and without a top-cut of 30 g/t Au applied.

    For more information, please contact:

    Matt Manson
    President & CEO
    Tel: 416 987-0711
    mmanson@marathon-gold.com

    Hannes Portmann
    CFO & Business Development
    Tel: 416 855-8200
    hportmann@marathon-gold.com

    Amanda Mallough
    Senior Associate, Investor Relations
    Tel: 416 855-8202
    amallough@marathon-gold.com


    To find out more information on Marathon Gold Corporation and the Valentine Gold Project, please visit www.marathon-gold.com.

    Cautionary Statement Regarding Forward-Looking Information

    Certain information contained in this news release, constitutes forward-looking information within the meaning of Canadian securities laws (“forward-looking statements”). All statements in this news release, other than statements of historical fact, which address events, results, outcomes or developments that Marathon expects to occur are forward-looking statements. Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as “expects”, “anticipates”, “plans”, “believes”, “estimates”, “considers”, “intends”, “targets”, or negative versions thereof and other similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future, and readers are cautioned that such statements may not be appropriate for other purposes. More particularly and without restriction, this news release contains forward-looking statements and information about the FS and the results therefrom (including IRR, NPV5%, Capex, FCF, AISC and other financial metrics), the realization of mineral reserve and mineral resource estimates, the future financial or operating performance of the Company and the Project, capital and operating costs, the ability of the Company to obtain all government approvals, permits and third-party consents in connection with the Company’s exploration, development and operating activities, the potential impact of COVID-19 on the Company, the Company’s ability to successfully advance the Project and anticipated benefits thereof, economic analyses for the Valentine Gold Project, processing and recovery estimates and strategies, future exploration and mine plans, objectives and expectations and corporate planning of Marathon, future environmental impact statements and the timetable for completion and content thereof and statements as to management's expectations with respect to, among other things, the matters and activities contemplated in this news release.

    Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. In respect of the forward-looking statements concerning the interpretation of exploration results and the impact on the Project’s mineral resource estimate, the Company has provided such statements in reliance on certain assumptions it believes are reasonable at this time, including assumptions as to the continuity of mineralization between drill holes. A mineral resource that is classified as “inferred” or “indicated” has a great amount of uncertainty as to its existence and economic and legal feasibility. It cannot be assumed that any or part of an “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category of mineral resource. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into proven and probable mineral reserves.

    By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations; uncertainty as to estimation of mineral resources; inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral resources); the potential for delays or changes in plans in exploration or development projects or capital expenditures, or the completion of feasibility studies due to changes in logistical, technical or other factors; the possibility that future exploration, development, construction or mining results will not be consistent with the Company’s expectations; risks related to the ability of the current exploration program to identify and expand mineral resources; risks relating to possible variations in grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined; operational mining and development risks, including risks related to accidents, equipment breakdowns, labour disputes (including work stoppages and strikes) or other unanticipated difficulties with or interruptions in exploration and development; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; risks related to commodity and power prices, foreign exchange rate fluctuations and changes in interest rates; the uncertainty of profitability based upon the cyclical nature of the mining industry; risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental or other stakeholder approvals or in the completion of development or construction activities; risks related to environmental regulation and liability, government regulation and permitting; risks relating to the Company’s ability to attract and retain skilled staff; risks relating to the timing of the receipt of regulatory and governmental approvals for continued operations and future development projects; political and regulatory risks associated with mining and exploration; risks relating to the potential impacts of the COVID-19 pandemic on the Company and the mining industry; changes in general economic conditions or conditions in the financial markets; and other risks described in Marathon’s documents filed with Canadian securities regulatory authorities, including the Annual Information Form for the year ended December 31, 2020.

    You can find further information with respect to these and other risks in Marathon’s Amended and Restated Annual Information Form for the year ended December 31, 2020 and other filings made with Canadian securities regulatory authorities available at www.sedar.com. Other than as specifically required by law, Marathon undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events or results otherwise.
    Report TOU ViolationShare This Post
     Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext