SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Rare Earth Elements and Exotic Metals

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: LoneClone who wrote (18154)4/8/2021 12:11:59 PM
From: LoneClone1 Recommendation

Recommended By
sense

  Read Replies (1) of 19140
 
Rio Tinto produces battery-grade lithium from waste rock at US mine

miningweekly.com

7th April 2021

By: Mariaan Webb
Creamer Media Deputy Editor Online

Diversified major Rio Tinto has started production of battery-grade lithium from waste rock at a lithium demonstration plant at the Boron mine in California.

The demonstration plant is the next step in scaling up what the company states is a breakthrough lithium production process developed at Boron – to recover the critical mineral and extract additional value out of waste piles from more than 90 years of mining at the operation.

“This is a valuable next step in scaling up our production of lithium at the Boron site, all from using waste material without the need for further mining,” Rio Tinto Minerals CE Sinead Kaufman says in a statement.

An initial small-scale trial in 2019 successfully proved the process of roasting and leaching waste rock to recover high grades of lithium.

The demonstration plant has a design capacity of 10 t/y of battery grade lithium. The plant will be run throughout 2021 to optimise the process and to inform the miner’s feasibility assessment for progressing to a production scale plant of at least 5 000 t/y.

Best known for its iron-ore, aluminium and copper offerings, Rio Tinto is keen to expand more into battery metals. The company’s lithium pipeline also includes the Jadar lithium/borate project, in Serbia, for which a feasibility study is expected to be complete by the end of the year.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext